Method Statement & HSE Statement
Method Statement & HSE Statement
Scope of Work
1. Scope of Work
The works involve exterior façade and window cleaning for villas, townhouses, and community buildings within
Masaar Community, Sharjah. Services include routine exterior glass/window cleaning (quarterly or scheduled),
façade washing using water-fed pole systems, and optional add-on services such as water tank cleaning and
exterior surface washing.
2. Resources & Equipment
• Water-fed pole system with reverse-osmosis purified water
• Extension poles and ladders (used only where safe and permitted)
• Eco-friendly cleaning solutions (where required)
• Personal protective equipment (PPE): harnesses, safety helmets, high-visibility vests, gloves, and non-slip
footwear
3. Sequence of Works
1. Pre-site inspection – confirm access, risks, and client requirements.
2. Setup – cordon off work area with safety signage and barriers.
3. Cleaning process Apply purified water via pole-fed system, agitate with soft-bristle brush, rinse down with
pure water.
4. Completion checks supervisors inspect and sign-off.
5. Site clearance – remove barriers, signage, and equipment.
4. Risk Control Measures
• All staff trained in working at height and safe use of ladders
• Harnesses used when working on elevated surfaces
• Weather conditions assessed before starting (no work during high winds, storms, or lightning)
• Secure cordoning to protect public and residents
• Use of eco-friendly cleaning methods to avoid chemical runof
HSE Statement – ClearView Cleaning Services
Scope of Work
Health & Safety Commitment
ClearView Cleaning prioritizes employee safety, client property protection, and public welfare. Our workforce is
trained and equipped with appropriate PPE and follows industry best practices for working at height and
chemical-free cleaning.
• Daily safety briefings before work
• Zero tolerance for unsafe practices
• First aid kits and trained personnel available at all times
Environmental Commitment
We adopt sustainable practices:
• Use of reverse-osmosis purified water to minimize chemical usage
• Responsible wastewater disposal
• Energy-efficient cleaning equipment
• Commitment to reducing carbon footprint by using community-based service vehicles
Emergency Procedures
• Clear communication lines via supervisor on-site
• Emergency contacts posted on all workstations
• Immediate reporting and investigation of any incidents